|
The ODA have targetted 50% of materials to be delivered by non road transport to the 2012 Olympic Site and Stratford City development. We have undertaken a number of trials to prove the viability of a water borne solution in order to assist in the ODA target.
Our modular system can operate across London.
Our hopper barge is designed for use with the new "Prescott" lock and is capable of carrying up to 1000 tonnes per lock movement.
|